Set by administrators and used for every block. Kerbs and asphalt are shown as quantities; the budget prices surface dressing as in the sample.
Road lengths: OpenStreetMap (2026-10-01), cut to each block boundary. Where a surveyed length has been entered it replaces the map figure (marked “surveyed”).
Unit rates (from the road works budget workings)
Rates, work outputs and fuel use come from the ACERCRAC road works budget sample. Administrators can change and save them.