Road bill of quantities

Kilometres of road inside every block, measured from the Miami Asset Hub boundaries, with full-surfacing quantities per block and POA.

Total road

172.5 km

Surface area

1,207,388 m²

Estimated budget

$38,812,050

Blocks

37

Road map by block

Every road counted in this bill of quantities, cut to its block boundary. Select a block or a road to see it.

Loading map…
C G Msipa Road — profile & cross-sectionsGround levels every 20 m, cut & fill, block by blockEngineering drawingsCrowhill road cross-sections, storm drain and culvert details — view online

Road specification (full surfacing)

Set by administrators and used for every block. Kerbs and asphalt are shown as quantities; the budget prices surface dressing as in the sample.

Road lengths: OpenStreetMap (2026-10-01), cut to each block boundary. Where a surveyed length has been entered it replaces the map figure (marked “surveyed”).

Unit rates (from the road works budget workings)

Rates, work outputs and fuel use come from the ACERCRAC road works budget sample. Administrators can change and save them.

Detailed budget — All ACERCRAC blocks

ItemDescriptionUnitsQuantityUnit costAmount
1Bush clearing & dozing (Dozer D8) — machine hirehrs2,110$130$274,286
2Bush clearing & dozing (Dozer D8) — fuellitres62,980$2.1$132,259
3Road formation & shaping (Grader) — machine hirehrs1,533$130$199,315
4Road formation & shaping (Grader) — fuellitres19,165$2.1$40,246
5Drainage excavation (JCB) — machine hirehrs1,380$55$75,893
6Drainage excavation (JCB) — fuellitres10,349$2.1$21,733
7Crusher-run gravel — materialm³413,962$5$2,069,808
8Crusher-run gravel — transport to roadsm³413,962$0.83$343,588
9Crusher-run gravel — spreadingm³413,962$1$413,962
10Compaction & water bowser — hirehrs431$100$43,121
11Compaction & water bowser — fuellitres3,773$2.1$7,923
12Surface dressing (tar & chippings)m²1,207,388$14.91$18,002,155
13Precast culverts (supply & install)each8,642$1,165$10,067,930
14Lined stormwater drainsm137,987$14.91$2,057,389
Subtotal$33,749,609
Contingencies 15%$5,062,441
Total budget estimate$38,812,050

Arcon POA

BlockMap kmSurveyed kmRoad kmSurface m²Sub-base m³Base m³Asphalt tKerbs mDrains mCulvertsBudget USD
Block 305.87—5.8741,0767,9226,1613,94311,73611,736294$1,320,400
Block 319.45—9.4566,12912,7539,9196,34818,89418,894473$2,125,312
Block 325.72—5.7240,0547,7256,0083,84511,44411,444287$1,287,969
Block 3312.18—12.1885,22516,43612,7848,18224,35024,350609$2,738,249
Block 347.76—7.7654,34110,4808,1515,21715,52615,526389$1,746,882
Block 359.08—9.0863,58812,2639,5386,10418,16818,168455$2,043,882
Arcon total50.06350,41367,58052,56233,640100,118100,1182,507$11,262,694

Cleverhills POA

BlockMap kmSurveyed kmRoad kmSurface m²Sub-base m³Base m³Asphalt tKerbs mDrains mCulvertsBudget USD
Block 51.43—1.4310,0241,9331,5049622,8642,86472$322,564
Block 83.71—3.7125,9425,0033,8912,4907,4127,412186$834,343
Block 93.17—3.1722,2184,2853,3332,1336,3486,348159$714,171
Block 101.96—1.9613,6852,6392,0531,3143,9103,91098$439,975
Block 111.59—1.5911,1582,1521,6741,0713,1883,18880$358,861
Block 121.73—1.7312,1242,3381,8191,1643,4643,46487$390,028
Block 131.06—1.067,4271,4321,1147132,1222,12254$239,870
Block 140.91—0.916,3561,2269536101,8161,81646$204,995
Block 152.09—2.0914,6162,8192,1921,4034,1764,176105$470,353
Block 163.84—3.8426,9015,1884,0352,5827,6867,686193$865,353
Block 172.31—2.3116,1493,1142,4221,5504,6144,614116$519,669
Block 182.94—2.9420,5593,9653,0841,9745,8745,874147$660,674
Block 192.22—2.2215,5262,9942,3291,4904,4364,436111$498,918
Block 200.75—0.755,2641,0157905051,5041,50438$169,646
Block 365.01—5.0135,0706,7645,2613,36710,02010,020251$1,127,319
Block 378.78—8.7861,43911,8499,2165,89817,55417,554439$1,973,973
Cleverhills total43.49304,45858,71745,66929,22886,98886,9882,182$9,790,711

Crowhill POA

BlockMap kmSurveyed kmRoad kmSurface m²Sub-base m³Base m³Asphalt tKerbs mDrains mCulvertsBudget USD
Block 17.81—7.8154,69810,5498,2055,25115,62815,628391$1,757,614
Block 24.47—4.4731,2906,0354,6943,0048,9408,940224$1,005,883
Block 35.03—5.0335,1896,7865,2783,37810,05410,054252$1,131,343
Block 45.86—5.8640,9857,9046,1483,93511,71011,710293$1,317,007
Block 63.53—3.5324,7314,7703,7102,3747,0667,066177$794,970
Block 76.36—6.3644,5068,5836,6764,27312,71612,716318$1,429,921
Crowhill total33.06231,39944,62734,71022,21466,11466,1141,655$7,436,739

Echo POA

BlockMap kmSurveyed kmRoad kmSurface m²Sub-base m³Base m³Asphalt tKerbs mDrains mCulvertsBudget USD
Block 214.93—4.9334,5106,6565,1773,3139,8609,860247$1,109,328
Block 223.73—3.7326,0895,0313,9132,5057,4547,454187$838,999
Block 236.03—6.0342,2178,1426,3334,05312,06212,062302$1,356,854
Echo total14.69102,81619,82915,4229,87029,37629,376736$3,305,181

Rumani POA

BlockMap kmSurveyed kmRoad kmSurface m²Sub-base m³Base m³Asphalt tKerbs mDrains mCulvertsBudget USD
Block 245.43—5.4337,9827,3255,6973,64610,85210,852272$1,221,137
Block 254.66—4.6632,6346,2944,8953,1339,3249,324234$1,049,596
Block 265.79—5.7940,5657,8236,0853,89411,59011,590290$1,303,515
Block 276.91—6.9148,3919,3337,2594,64613,82613,826346$1,555,064
Block 284.29—4.2930,0445,7944,5072,8848,5848,584215$965,721
Block 294.10—4.1028,6865,5324,3032,7548,1968,196205$921,692
Rumani total31.19218,30242,10132,74520,95762,37262,3721,562$7,016,725