Ground levels every 20 m, cut & fill and cross-sections for each recognised named road in the selected area.
Road specification (full surfacing)
Set by administrators and used for every block. Kerbs and asphalt are shown as quantities; the budget prices surface dressing as in the sample.
Road lengths: mapped roads plus saved drawn roads, cut to each current block boundary. Overlapping traced sections are counted once. Where a surveyed length has been entered it replaces the map figure (marked “surveyed”).
Unit rates (from the road works budget workings)
Rates, work outputs and fuel use come from the ACERCRAC road works budget sample. Administrators can change and save them.